Time & Work LCM Shortcut

SBI POIBPS POSSC CGLRRB

Yaad Karne ki List

  1. LCM Method: Total work = individual days ka LCM
  2. Efficiency = Total Work / Days
  3. Combined efficiency = individual efficiencies ka sum
  4. A x days, B y days mein: Together = xy/(x+y) days
  5. Pipes: Filling = +ve, Draining = −ve
  6. Alternate day work: 2-day cycle output nikalo
  7. Wages: kiye gaye kaam ke ratio mein distribute

Mnemonic Tricks

Shortcut Method

LCM Method: Days ka LCM = Total Work units. Efficiency = Total/Days. Efficiencies add karo. Time = Total/Combined.

Kaise Map Hota Hai

Cue Maps To
Step 1 Total Work = LCM(A ke days, B ke days)
Step 2 A ki efficiency = Total/A ke days
Step 3 Combined = Eff(A) + Eff(B)
Step 4 Together = Total/Combined

Yeh Fast Kyun Hai

LCM method fractions ko whole numbers mein convert karta hai — mental math dramatically fast ho jaati hai.

Aksar Poochhe Jaane Wale Sawaal

Time & Work mein LCM method kya hai?

Sabke days ka LCM = Total Work. Efficiency = Total ÷ Days. Efficiencies jodo. Time together = Total ÷ Combined efficiency.

Pipes problems kaise solve karein?

Same LCM method. Filling pipes = +ve efficiency, draining = −ve. Net efficiency = sum of all with signs.